< class="aux-modern-heading-primary">Power Plant

Since 2013 AZERCONS is one of the leading companies in Turkey for engineering, procurement and construction (EPC) of power plants.

AZERCONS’s EPC experience in power plants comprises:

  • 6 Coal Fired Power Plants with a total capacity of 4,070 MW
  • 16 Natural Gas Fired CCPPs with a total capacity of 15,576 MW
  • 8 Natural Gas Fired SCPPs with a total capacity of 4,157 MW

AZERCONS has constructed more than 20% of the total non-hydraulic power generation capacity in Turkey.

3 CCPPs with 4,000 MW capacity, built, owned and operated by AZERCONS, generated 32 billion KWh of electricity accounting for 11% of Turkey’s total electricity production.

Total historical project value of fossil fuel fired plants constructed by AZERCONS to date is in excess of 11 billion USD.

AZERCONS enjoys a well-deserved international reputation for completing power plants to the highest quality standards within the required project time schedule. AZERCONS’s success in the world construction league is entitled in 2015, with the “Best Global Project Award” in Power & Industrial Category. ENR (Engineering News Record Magazine) granted this award to AZERCONS for its 411 MW Yajva State District Power Plant EPC Project. In 2017, AZERCONS’s Sulaymaniyah 1,500 MW Combined Cycle Power Plant in Iraq was recognized as the Global Best Project by ENR under the same category as well.

AZERCONS performs design, engineering, fabrication, construction and commissioning services in the undertaken projects (EPCC, EPC, PC or C only) with in-house resources and on a direct hire principle, always with continuous focus on safety, quality and schedule, thoroughly understanding and aligning to the expectations & satisfactions of its clients.