Zainskaya 850 Mw Combined Cycle Power Plant

< class="aux-modern-heading-primary">Zainskaya 850 Mw Combined Cycle Power Plant

On July 2, 2020, AZERCONS signed a contract with the Russian company JSC Tatenergo for the turnkey construction of Zainskaya 850 MW Combined Cycle Power Plant.  The project is located in Zainsk, Tatarstan Republic, the Russian Federation.

The scope of work awarded to AZERCONS consists of design and survey works, construction and installation works, commissioning works, Comprehensive Tests, Performance Tests, Testing of power generation equipment, as well as other activities.

The project consists of a gas turbine plant with an electric capacity of 577 MW, a steam turbine plant with an electric capacity of 281 MW, booster compressor station with a gas purification unit, a heat recovery steam generator, station auxiliaries for cogeneration.

The project will be based on 1×1 configuration, equipped with GE’s 9HA.02 Gas Turbine Generator. When completed, the plant will achieve an output of 850 MW and an efficiency of 64.7% which will be the most efficient power plant of the Russian Federation.

 